Lex – -30% power saving, the operation of the complicated wells is stabled at fields in Romania, Eastern Europe

-30% power saving, the operation of the complicated wells is stabled at fields in Romania, Eastern Europe

There is a case of successful well production optimization in harsh conditions with high gas content and unstable inflow. We replaced the progressive cavity pump (PCP) with Lex Ultra-High-Speed ESP (UHS ESP™) at fields operated by the largest Romanian oil and gas producer. The project was targeted to equipment operation stability in depleted well complicated by high gas content and reducing power consumption.

-30% power saving, the operation of the complicated wells is stabled at fields in Romania, Eastern Europe

Results

Our client, the largest oil and gas producer in Eastern Europe, contacted us to tune up the existing equipment operation, optimize power consumption, and decrease the installation time of submersible equipment in wells at the field in Romania.

The oil field reservoir is located at 3,600 ft MD (1,100 m MD). The reservoir temperature is up to 194-212 °F (90-100 °C), the operating well is completed with a 7″ (177,8 mm) API Casing, and reservoir pressure is below bubble-point pressure (gas forms in the reservoir).

The complicating factors:

Since 2018, we have started working on the project. The client has provided information on well completion, inflow performance and PVT, previous equipment operation, and well intervention history. Lex engineers have carefully analyzed provided data and prepared comprehensive design, demonstrating solutions to each existing well issue.

The previous progressive cavity pump did not meet the client’s oil recovery and energy efficiency requirements. So, it was decided to replace the PCP with UHS ESPTM – a power-efficient UHS-600 ESP system with flow range from 280 to 720 bblpd at 500 bblpd at BEP (from 45 to 115 m3/d with 80 m3/d at BEP).

The Client approved our project because of the unique UHS ESPTM advantages over competitors’ equipment:

After the transport company delivered the equipment to the well, our team of engineers supervised the system’s installation and commissioning, including pre-installation check, on-site installation, start-up, and ramping-up, monitoring to ensure stable and efficient production. Also, to help the Client’s engineers be more familiar with the unique technology of UHS ESPTM, we conducted regular training both in the office and in the field. 

The client was delighted with the results achieved. This project has fully proven the effectiveness of Lex Ultra-High-Speed ESP (UHS ESPTM) in complicated conditions of the field.

All case studies